| |
No. 2(6)/2006-PPI PUBLIC
NOTICE August
31, 2006 |
| |
|
| |
Scheme for Freight Subsidy on Exports (2006-07) |
| |
|
| |
It is notified for the information of exporters that, in terms of the Trade Policy for 2006-07, the freight subsidy scheme has been modified according to the following revised rules and regulations. |
| |
|
| 1. |
Short Title and Commencement: |
| |
The scheme will be called “Scheme for Freight Subsidy on Exports”, hereinafter referred to as “the scheme”. The scheme is designed to leverage our market and product diversification efforts. Freight subsidy scheme will apply to exports/ shipments made between 1st August 2006 and 31st July 2007. |
| |
|
| 2. |
Definitions: |
| |
 |
“Eligible Products” will include all products except the product categories listed in Annex-I, provided that (a) if exported to Pakistan’s strategic regions for export diversification, but initially limited to Annex-II, that is, (i) Africa, (ii) Pacific Islands, (iii) East European countries not included in the European Union, and (iv) the Central Asian Republics. |
 |
“Developmental Products”, Annex-III, if exported to Pakistan’s leading export destinations listed in Annex-IV.
(12 items of furniture were included on 2nd March 2007 and product mango was excluded from the benefit of freight subsidy on 27th March 2007) |
 |
“National Bank” means the National Bank of Pakistan, FTC Branch, Karachi. |
 |
“Bank” means the commercial bank which processes the freight subsidy claim and which also handled export documents connected with the freight subsidy claims. |
|
| |
|
| 3. |
Admissibility of Freight Subsidy: |
| |
|
| |
|
| 4. |
Documentary requirements: |
| |
Exporter will file his application on the prescribed form (Annex-V), with his commercial bank which processed his E-Form as per the time frame given in para 5 below. The exporter will attach the following documents with his application: |
| |
|
| |
- Summary of claim (Annex-VI).
- A copy of Commercial Invoice.
- 4th copy of Shipping Bill / GD in original bearing the rubber stamp “Under freight subsidy claim” along with one photocopy set which will be retained by the bank and the original returned to the exporter after verification by the Manager of the bank. The above rubber stamp will be stamped by the exporter on his GD at the time of shipment in case the exporter intends to claim the freight subsidy later. Failure to rubber stamp the Shipping Bill/ GD at the time of its filing with the Customs will invalidate the freight subsidy claim. Customs officer will sign on top of the rubber stamp in confirmation.
(The requirement of stamping of GD documents with “ Under Freight Subsidy Claims” has been dispensed with on 14th April 2007.)
- A copy of B/L or Airway Bill where the freight has been certified by the Air Line/Air Cargo Agent, which handled the shipment, in case of air shipments and by the Shipping Line/Shipping Agent, which handled the shipment, in case of sea shipments.
(As amended in public notice of 14th April 2007,in case of freight booked by a Freight Forwarder/ Air Cargo Agent, a certificate from the concerned association of Freight Forwarders/ Air Cargo Agents on their letter head certifying the freight paid on the shipment.)
- Original freight paid receipt (Truck Receipt/ Railway Receipt incase of land route freight) issued by the transport agency, which handled the shipment.
- copy of Bank Credit Advice wherever available at the time of filing of claim. However, exporters can file their claims without BCA, but payment in such cases will be authorized after receipt and filing of copy of BCA.
- Check list of required documents signed and stamped by the Manager of the processing bank (Annex-VII). It will be the responsibility of the Bank Manager to ensure that all documents as required are correct and attached.
|
| |
|
| 5. |
Procedural requirements: |
| |
 |
Exporter will lodge his claim on prescribed application form with his bank within 30 days of export shipment (The time limit for filing subsidy claims has been increased from 30 days to 60 days of the shipment date. This relaxation will also be applicable to the claims already filed). |
 |
Exporter will attach copy of BCA, if available, with his claim in addition to other documents as provided in this Public Notice. If BCA is not available, exporter can file his claim without BCA. The claim will be processed by the Auditors and intimation regarding the acceptance of such claims or otherwise will be sent by the Auditors to his bank within the given time frame, but payments for subsidy in such cases will be released by the Auditors on receipt of copy of BCA duly attested by the Manger of the bank of the exporter. |
 |
The bank will process the claim and check that the documents required have been submitted by the exporter and will forward the claim to National Bank within 10 days of the receipt of the claim application, along with Checklist of documents verified by the Manager of the bank. The National Bank will forward the claim to the Auditors within three days after entering the claim in their record. |
 |
The Auditors, on receipt of a claim, will allocate a unique identification number to the claim and feed its data into their database. They will audit the claim and send payment advice to the National Bank of Pakistan, FTC Branch, Karachi, within 7 days of the receipt of claim from the bank, if the claim is in order; this would be done strictly on first-come-first -served basis. |
 |
The unique identification number allotted by the Auditors to the claim will be prominently shown on all documents relevant to a claim and will be quoted in all communications, including the Auditors’ approval, objections and rejection of the claim, and by the exporter while resubmission of claim, tracing a claim or lodging a complaint/ appeal with TDAP. |
 |
If the claim is not found in order or incomplete, the Auditors will return the claim to the concerned bank with their audit observations, with request for resubmission within 30 days, which when received back will be put in queue of resubmitted claims. These claims will be disposed of by the Auditors within 7 days of receipt. The Auditors will report to TDAP the claims remaining un-disposed even after resubmission. |
 |
If the Auditors find that the claim is not amenable to rectification, they will return the claim to the concerned bank with reasons for rejection, within 7 days. |
|
| |
|
| 6. |
Implementation of the Scheme: |
| a. |
Implementation of the scheme will be monitored by a Steering Committee, in the TDAP comprising |
| |
- Chief Executive TDAP/ Secretary TDAP
- Director General (PPI) TDAP
- Director General (Supply Management) TDAP
- Consultant (Policy) TDAP
- Collector of Customs (Exports), Karachi
- Director Foreign Exchange, State Bank of Pakistan, Karachi
- Manager, National Bank of Pakistan, FTC Branch, Karachi
- Representative of Pakistan Banking Association
- Representative of Pakistan Shipping Association
- Representative of Air Cargo Agents Association
- Representative of Freight Forwarders Association
- irector, TDAP, Member / Secretary
|
| b. |
The Steering Committee will: |
| |
|
| |
|
| c. |
The Steering Committee will be assisted by a Technical Committee comprising Director General (PPI) TDAP, Consultant (Policy) TDAP, Additional Collector of Customs (Exports), Karachi, Chairman of the Air Cargo Agents Association, a representative of the Freight Forwarders Association, and Manager National Bank. |
| |
|
| |
|
| 7. |
Appeal: |
| |
The exporter will have the right to file an appeal with Chief Executive, TDAP within 30 days of rejection by the Auditors giving reasons for contesting the decision of the Auditors. The decision of the Chief Executive, TDAP will be final. |
| |
|
| |
Click on the links below for download PDF |
| |
Annex
- I
Annex
- II
Annex
- III
Annex
- IV
Annex
- V
Annex
-VI
Annex
- VII |
| |
|
| |
|